Mississippi DOT TAMP


Published: 2019

The Mississippi DOT TAMP is available here.


Document summary:

The MDOT TAMP outlines the current state transportation asset management (TAM) in Mississippi as it seeks to engender a safe and efficient transportation system. The TAMP is an important counterpart to Mississippi's 2045 Mississippi Unified Long-Range Transportation Plan, for it provides the framework for cost-effective asset management throughout an asset's life-cycle.

This document includes the following sections: Asset Valuation, Current Methods and Tools, Financial Plan, Introduction, Inventory and Condition, Investment Strategies, Lifecycle Management, Objectives and Measures, Performance Assessment, Process Improvements, Risk Management.
This document meets the following additional criteria:
• Asset valuation included
• Defines linkages to other planning & programming documents
• Future cost/performance projections are based on management system analysis (e.g. HERS, dTIMS)
• Includes cost projections for meeting performance or LOS targets
• Includes estimates of future maintenance costs
• Includes estimates of future rehabilitation, replacement, reconstruction, and/or renewal costs
• Includes formal risk assessment results such as a risk register
• Includes future projected asset condition
• Includes strategies for multiple funding scenarios
• Includes substantive list of process, data, and/or systems improvement actions
• Investment strategies consistent with and linked to capital program
• Investment strategies summarize planned capital and operating expenditures
• Key revenue projection assumptions identified
• Performance/LOS targets are linked to agency goals/objectives
• Risk assessment results incorporated into investment strategies.
The modal scope of this document is: Highway Only.
The asset scope of this document is: Highway Assets, Pavement and bridge only.
External link (if available):